HDB 4 ROOM FLAT PACKAGE
SCOPE OF WORKS INCLUDE.... BATHROOM WORK - HACKING OF WALL AND FLOOR TILE FOR 2 BATHROOMS - DISMANTLE AND DISPOSE EXISTING WC, VANITY AND BATHROOM ACCESSORIES FOR 2 BATHROOMS KITCHEN WORKS -HACKING OF WALL AND FLOOR TILE @ KITCHEN AREA -DISMANTLE EXISTING KITCHEN TOP AND BOTTOM CABINET HAULAGE OF MATERIALS - UPLIFT OF RAW MATERIAL TO THE UNIT RUBBISH DISPOSAL - DISPOSAL OF DEBRIS AND RUBBISH X 3 TRIPS OTHER ITEM THAT IS NOT LISTED IN THE PACKAGE WILL BE SEPERATE COSTING.
$2,100.00
HDB 5 ROOM FLAT PACKAGE
SCOPE OF WORKS INCLUDE.... BATHROOM WORK - HACKING OF WALL AND FLOOR TILE FOR 2 BATHROOMS - DISMANTLE AND DISPOSE EXISTING WC, VANITY AND BATHROOM ACCESSORIES FOR 2 BATHROOMS KITCHEN WORKS -HACKING OF WALL AND FLOOR TILE @ KITCHEN AREA -DISMANTLE EXISTING KITCHEN TOP AND BOTTOM CABINET HAULAGE OF MATERIALS - UPLIFT OF RAW MATERIAL TO THE UNIT RUBBISH DISPOSAL - DISPOSAL OF DEBRIS AND RUBBISH X 3 TRIPS OTHER ITEM THAT IS NOT LISTED IN THE PACKAGE WILL BE SEPERATE COSTING.
$2,200.00
COMMERCIAL UNIT BELOW 1000 SF
Scope of Work Include Supply labour to remove all furniture and loose items from the unit Supply labour and materials to hack and remove existing ceiling structures throughout the unit Supply labour and materials to hack and remove existing floor finishes throughout the unit Supply labour and materials to hack and remove all internal partitions Make good and reinstate all hacked areas to a safe and even condition Collect, load, and dispose of all demolition debris and waste materials Paint the entire unit back to original condition upon completion
$8,000.00
COMMERCIAL UNIT FROM 1001- 2000 SF
Scope of Work Include Supply labour to remove all furniture and loose items from the unit Supply labour and materials to hack and remove existing ceiling structures throughout the unit Supply labour and materials to hack and remove existing floor finishes throughout the unit Supply labour and materials to hack and remove all internal partitions Make good and reinstate all hacked areas to a safe and even condition Collect, load, and dispose of all demolition debris and waste materials Paint the entire unit back to original condition upon completion
$12,000.00
COMMERCIAL UNIT FROM 2001 SF AND ABOVE
Scope of Work Include Supply labour to remove all furniture and loose items from the unit Supply labour and materials to hack and remove existing ceiling structures throughout the unit Supply labour and materials to hack and remove existing floor finishes throughout the unit Supply labour and materials to hack and remove all internal partitions Make good and reinstate all hacked areas to a safe and even condition Collect, load, and dispose of all demolition debris and waste materials Paint the entire unit back to original condition upon completion BOOK US FOR APPOINTMENT